Operating procedures vary from model to model and
are dependent on the application. For detailed information
please contact us with your exact requirement.
1. Connect the preset regulator, BPC flow meter
with the knob {for flow} in the closed condition
and Humidifier to the cylinder.
2. Open the cylinder valve, by operating the
valve spindle gradually. Check and ensure that
there is no leakage in the connection between
the cylinder valve and the regulator.
3. Adjust the knob on the flow meter by turning
anti clockwise, and set the same to the desired
flow.
4. Connect the facemask / Nasal Cannula.
5. After the usage, the following sequence of
activities shall be followed.
- Close the knob on the flow meter.
- Close the cylinder valve.
- Open the Knob on the flow meter to release
the entrapped gas from the cylinder outlet valve
to the point of use.
- Close the Knob of the flow meter.
- The regulator if required is dismantled from
the cylinder.
It is recommended that the above is carried
out every time the regulator is not in use even
for short periods.
Top
|